Signalling: Procedures

For assistance, email standards@artc.com.au or visit the Engineering Help pages. To report an issue in an engineering document or propose a change, please complete EGP0101F-02 Engineering Document Change Request and email this to standards@artc.com.au.

This page contains documents that are currently known as Policies, Procedures, Standards, Engineering Instructions and Specifications.

Where there is conflict between any Standards, Procedures or Specifications published, the Common Standards that are applicable network wide take precedence, unless otherwise indicated.

Engineering Instructions take precedence over Standards, Procedures and Specifications for that particular subject.

Signalling Procedures are published by document category which is based on the life cycle of the infrastructure and then by detail code which groups particular infrastructure elements together.

The State in which the document is applicable is shown in the Applicability table. Note, documents marked with NSW applicability also apply to QLD by default.

Generalback to top

Number Title Last Updated Version
Document Type
Commentary
Issues Register
Applicability
       
(under current document structure)
SA (S)
WA (W)
VIC (V)
NSW (N)
QLD (Q)
General
S5 S5 Signals - Decommissioning 04 May 99 1.1 SA/WA Specification     S W      
SGS 01 Glossary of Signalling Terms 14 Mar 05 1.2 NSW Standard           N Q
SGS 02 Glossary of Terms 14 Mar 05 1.2 NSW Standard           N Q
ESI-07-02 Signals Design Documentation 24 Jan 08 1.1 Engineering Instruction           N Q
ESI-00-02 Implementing Signalling Standards 12 Feb 09 1.0 Engineering Instruction     S W V N Q
ESG-00-15 ARTC Quality Controlled Supplier 27 Nov 14 1.0 Engineering Instruction     S W V N Q

Designback to top

Number Title Last Updated Version
Document Type
Commentary
Issues Register
Applicability
       
(under current document structure)
SA (S)
WA (W)
VIC (V)
NSW (N)
QLD (Q)
General
ESI-05-14 Signal Design and Maintenance of Configuration Information 04 Jul 17 1.0 Engineering Instruction Y   S W V N Q
ESI-05-13 Signal Design and Standards Applicability 07 Mar 17 1.0 Engineering Instruction     S W V N Q
S1 S1 Signals - Design and Rating 13 Aug 10 3.0 SA/WA Specification     S W      
SDS 00 Introduction 14 Mar 05 1.2 NSW Standard           N Q
SCP 01 Signalling Control Systems 14 Mar 05 1.2 NSW Standard Y         N Q
SDS 05 Speed Restrictions 14 Mar 05 1.2 NSW Standard           N Q
SDS 06 Notice Boards 14 Mar 05 1.2 NSW Standard           N Q
SDS 07 Single Line Sections 14 Mar 05 1.2 NSW Standard           N Q
SDS 08 Bi-Directional Signalling 14 Mar 05 1.2 NSW Standard           N Q
SDS 15 Train Stops 14 Mar 05 1.2 NSW Standard           N Q
SDS 20 Warning Lights 14 Mar 05 1.2 NSW Standard           N Q
SDS 21 Placing Signals at Stop to Protect a Worksite 14 Mar 05 1.2 NSW Standard           N Q
SDS 22 Measurement of Distances on Signalling Plans - Superseded by ESD-00-02 14 Mar 05 1.2 NSW Standard           N Q
ESD-00-02 Measurement of Signalling Distances 13 Dec 16 1.0 Common Standard Y   S W V N Q
ESD-08-03 Placement of Yard Limit Signs 09 May 12 1.0 NSW Standard   Y       N Q
SDS 23 Placement of Yard Limit Boards - Superseded by ESD-08-03 14 Mar 05 1.2 NSW Standard           N Q
SDS 25 Signalling Circuit Design Standards 14 Mar 05 1.2 NSW Standard   Y       N Q
Control, Indication, Monitors, Wayside Equipment
SDS 16 Controls and Indications 14 Mar 05 1.2 NSW Standard           N Q
Level Crossings
ESD-03-01 Level Crossing Design 22 Nov 12 1.3 Common Standard     S W V N Q
ESD-03-02 Level Crossing Predictor Design Certification and Test 13 Aug 10 1.2 Common Standard   Y S W V N Q
ESI-03-02 Level Crossing Axle Counter Detection System Design 07 Jan 10 1.0 Engineering Instruction     S W V N Q
SDS 18 Level Crossings - Superseded by ESD-03-01 14 Mar 05 1.2 NSW Standard              
Interlockings, CBI Field Equipment
ESD-05-01 Common Signal Design Principles - S1 - Signalling Locking and Train Dynamics 13 Oct 15 3.0 Common Standard     S W V N Q
ESD-05-03 Train Braking Application Design 04 Oct 18 1.1 Common Standard Y   S W V N Q
ESD-05-11 Microlok Data Design Records (Addressing, File Control, Checking, and FAT Testing) 17 Feb 14 1.3 Common Standard     S W V N Q
ESD-05-12 Microlok II Design 13 Aug 10 1.3 Common Standard     S W V N Q
ESI-05-11 Microlok Address Management 05 Feb 14 1.0 Engineering Instruction     S W V N Q
ESI-06-02 Resetting Axle Counters 08 Nov 06 1.0 Engineering Instruction     S W V N Q
SCP 23 Design of Microlok II Interlockings 25 Jun 10 1.4 NSW Standard           N Q
SDS 01 Signals 25 Aug 06 2.0 NSW Standard           N Q
SDS 02 Headway - Superseded by ESD-05-01 14 Mar 05 1.2 NSW Standard              
SDS 03 Braking Distance - Superseded by ESD-05-03 04 Jun 10 1.3 NSW Standard           N Q
SDS 04 Overlaps 14 Mar 05 1.2 NSW Standard           N Q
SDS 09 Time Releases - Superseded by ESD-05-01 14 Mar 05 1.2 NSW Standard              
SDS 10 Locking Arrangements - Superseded by ESD-05-01 14 Mar 05 1.2 NSW Standard              
SDS 11 Approach Locking - Superseded by ESD-05-01 14 Mar 05 1.2 NSW Standard              
SDS 12 Route Holding - Superseded by ESD-05-01 14 Mar 05 1.2 NSW Standard              
SDS 13 Local Control 14 Mar 05 1.2 NSW Standard           N Q
SDS 14 Points 14 Mar 05 1.2 NSW Standard   Y       N Q
Field Equipment: Track Circuits, Trackside Equipment
ESD-07-02 Track Bonding and Signalling Infrastructure in Electrified Areas 13 Aug 10 1.2 Common Standard     S W V N Q
SDS 17 Track Circuits 14 Mar 05 1.2 NSW Standard           N Q
Train Authority Systems, Train Order Systems, Token and Tokenless Block
ESD-08-01 Train Order Working and Electronic Authority - Advanced Train Management System 23 Dec 16 /
22 Feb 17
1.6 Common Standard Y   S W V N Q
SDS 19 Train Orders - Superseded by ESD-08-01 01 Feb 08 2.0 NSW Standard              
SDS 24 Arrangement of Infrastructure at Signalling to Train Order and Token Area Boundaries 14 Mar 05 1.2 NSW Standard           N Q
Power Supply
ESD-09-01 Signalling Power Systems 12 Oct 09 1.0 Common Standard     S W V N Q
SCP 03 Signalling Power Systems 14 Mar 05 1.2 NSW Standard           N Q
Design Practices
ESD-25-01 CAD and Drafting Manual for Signalling Drawings 13 Aug 10 1.2 Common Standard     S W V N Q
SCP 06 Signalling Documentation and Drawings 9 Jun 10 1.4 NSW Standard           N Q
Rolling Stock Interface
ESD-32-01 Signalling Rolling Stock Interface 29 Jun 17 2.0 Common Standard Y   S W V N Q
SDS 26 Rolling Stock Signalling Interface Requirements - Superseded by ESD-32-01 14 Mar 05 1.2 NSW Standard              

Materialback to top

Number Title Last Updated Version
Document Type
Commentary
Issues Register
Applicability
       
(under current document structure)
SA (S)
WA (W)
VIC (V)
NSW (N)
QLD (Q)
General
SPS 02 Environmental Conditions 06 May 05 1.3 NSW Standard           N Q
SPS 03 Signs, Notice Plates and Instruction Plates 06 May 05 1.2 NSW Standard           N Q
SPS 04 General Requirements for Labelling of Equipment 06 May 05 1.2 NSW Standard           N Q
SPS 05 Electrical and Electronic Components (Ratings and Construction Requirements) 06 May 05 1.3 NSW Standard           N Q
SPS 06 Connectors for Signalling Interface 06 May 05 1.2 NSW Standard           N Q
SPS 07 Vital Indication Optoisolator 06 May 05 1.2 NSW Standard           N Q
SPS 08 Level Crossings Monitor Requirements 06 May 05 1.3 NSW Standard           N Q
SPS 09 Battery Voltage Monitor and Alarm 06 May 05 1.2 NSW Standard           N Q
SPS 10 Relays Plug-in Vital 06 May 05 1.3 NSW Standard           N Q
SPS 11 Light Signals 06 May 05 1.3 NSW Standard           N Q
SPS 12 Signal Lamps 06 May 05 1.2 NSW Standard           N Q
SPS 13 Electro-pneumatic Train Stops 06 May 05 1.3 NSW Standard           N Q
SPS 14 Hydraulic Train Stops 06 May 05 1.3 NSW Standard           N Q
SPS 16 Point Mechanisms 06 May 05 1.3 NSW Standard           N Q
SPS 17 6 ohm Track Resistor 06 May 05 1.2 NSW Standard           N Q
SPS 18 Centre-tapped Electrolysis Bond Chokes (30ARAIL) 06 May 05 1.2 NSW Standard           N Q
SPS 19 Impedance Boards 06 May 05 1.3 NSW Standard           N Q
SPS 23 Single Phased Air Cooled, Isolating Transformer for Signalling Applications 06 May 05 1.3 NSW Standard           N Q
SPS 24 Emergency Changeover Contactor Panel 06 May 05 1.3 NSW Standard           N Q
SPS 25 High Speed Emergency Changeover Contactor Panel 06 May 05 1.3 NSW Standard           N Q
SPS 26 Mains Failure Plant 06 May 05 1.2 NSW Standard           N Q
SPS 32 Fuses For Railway Signalling Applications 06 May 05 1.2 NSW Standard           N Q
SPS 33 Solderless Terminals - Cable Lugs for Signalling Applications 06 May 05 1.2 NSW Standard           N Q
SPS 51 Solderless Terminals Screw and Sprint Clamp Terminal Blocks 06 May 05 1.3 NSW Standard           N Q
Remote Control, Control Systems
SPS 01 Standard Requirements for Signalling Electronic Systems 06 May 05 1.3 NSW Standard           N Q
Field Equipment: Track Circuits, Trackside Equipment
SPS 20 High Voltage Impulse Track Circuits 06 May 05 1.2 NSW Standard           N Q
SPS 21 Audio Frequency Jointless Track Circuits for Main Line 06 May 05 1.3 NSW Standard           N Q
Power Supply
SPS 22 Power Supply Units for Signalling Equipment - General Requirements 06 May 05 1.3 NSW Standard           N Q
SPS 27 Power Supply Units for Signalling Equipment - DC (Unfiltered) Units 06 May 05 1.3 NSW Standard           N Q
SPS 28 Power Supply Units for Signalling Equipment - DC (Filtered) Units 06 May 05 1.3 NSW Standard           N Q
SPS 29 Power Supply Units for Signalling Equipment - DC Track Feeds 06 May 05 1.3 NSW Standard           N Q
SPS 30 Power Supply Units for Signalling Equipment - DC (Regulated And Filtered) Units 06 May 05 1.3 NSW Standard           N Q
SPS 31 Power Supply Units for Signalling Equipment - Battery Chargers 06 May 05 1.3 NSW Standard           N Q
SPS 34 Lightning/Surge Protection - Inductor/Varistor Panel 06 May 05 1.3 NSW Standard           N Q
SPS 35 Lightning/Surge Protection - Varistor/Arrestor Panel (Vap) 06 May 05 1.3 NSW Standard           N Q
SPS 36 Lightning/Surge Protection - Varistor Panel 06 May 05 1.3 NSW Standard           N Q
SPS 37 Lightning/Surge Protection - Power Inductors 06 May 05 1.3 NSW Standard           N Q
SPS 38 Lightning/Surge Protection for Communication Lines LPU 06 May 05 1.3 NSW Standard           N Q
SPS 39 Lightning/Surge Protection Inductor/Diverter Panel 06 May 05 1.3 NSW Standard           N Q
Cable and Line Route
ESA-11-01 Cables for Railway Signalling Applications - General Requirements 26 Oct 18 2.0 Common Standard     S W V N Q
ESA-02-01 Cables for Railway Signalling Applications - General Requirements - Superseded by ESA-11-01 27 Sep 06 1.0 Common Standard              
SPS 40 Cables for Railway Signalling Applications - General Requirements - Superseded by ESA-02-01 06 May 05 1.3 NSW Standard              
SPS 41 Supply and Installation of Cable Jointing Material for the Jointing and Repair of PVC Signal and Power Cables 14 Mar 05 1.1 NSW Standard           N Q
SPS 42 Cables for Railway Signalling Applications - Multi Conductor Signalling Cables - Superseded by ESA-02-01 06 May 05 1.3 NSW Standard              
SPS 43 Cables for Railway Signalling Applications - Fire Safe Multi-conductor Cables - Superseded by ESA-02-01 06 May 05 1.3 NSW Standard              
SPS 44 Cables for Railway Signalling Applications - Single Twin Conductor Cables - Superseded by ESA-02-01 06 May 05 1.3 NSW Standard              
SPS 45 Cables for Railway Signalling Applications - Single Conductor Cables for Indoor Use - Superseded by ESA-02-01 06 May 05 1.3 NSW Standard              
SPS 46 Cables for Railway Signalling Applications - Fire Safe High Frequency Screened Track Circuit Cable 06 May 05 1.3 NSW Standard           N Q
SPS 47 Cables for Railway Signalling Applications - Fire Safe Single and Twin Conductor Power Cables - Superseded by ESA-02-01 06 May 05 1.3 NSW Standard              
SPS 48 Cables for Railway Signalling Applications - High Frequency Screened Track Circuit Cables 06 May 05 1.3 NSW Standard           N Q
SPS 49 Cables for Railway Signalling Applications - Traction Return Bonding And Track Connection Cables 10 Feb 15 1.3 NSW Standard           N Q
SPS 50 Cables for Railway Signalling Applications - Fire Rate Twin Conductor Power Cables for Emergency Services - Superseded by ESA-02-01 14 Mar 05 1.2 NSW Standard              

Constructionback to top

Number Title Last Updated Version
Document Type
Commentary
Issues Register
Applicability
       
(under current document structure)
SA (S)
WA (W)
VIC (V)
NSW (N)
QLD (Q)
General
SCP 05 Signalling Electronic Systems Verification 14 Mar 05 1.2 NSW Standard           N Q
SCP 14 Type Approval Requirements for Signalling Systems and Equipment 14 Mar 05 1.2 NSW Standard           N Q
SCP 16 Signalling Operator Interface 14 Mar 05 1.2 NSW Standard           N Q
SCP 19 Air Reticulation Systems 14 Mar 05 1.2 NSW Standard           N Q
Level Crossings
ESC-03-01 Level Crossing Equipment 13 Aug 10 1.2 Common Standard Y   S W V N Q
ESI-03-01 Level Crossing Emergency Switches Box 12 Feb 09 1.0 Engineering Instruction     S W V N Q
SC 03 01 Level Crossing Equipment - Superseded by ESC-03-01 07 Jun 06 1.0 Common Standard              
Signals
ESC-04-01 Signal Sighting and Position 27 Oct 10 1.4 Common Standard Y   S W V N Q
ESC-04-02 Post Mounted Signals - Ladders 13 Aug 10 1.2 Common Standard Y   S W V N Q
PP-165 Signal Sighting - Superseded by ESC-04-01 01 Aug 06 1.2 Process Procedure              
Interlockings, CBI Field Equipment
SCP 17 Computer Based Interlocking Requirements 14 Mar 05 1.2 NSW Standard           N Q
Field Equipment: Track Circuits, Trackside Equipment
ESC-07-01 Installation of Trackside Equipment 13 Aug 10 1.3 Common Standard Y   S W V N Q
SC 08 01 Installation of Trackside Equipment - Superseded by ESC-07-01 and ESC-04-01 21 Mar 05 1.0 Common Standard              
SCP 15 Installation of Trackside Equipment 10 Jun 10 1.3 NSW Standard           N Q
ESC-07-03 Small Buildings, Location Cases, Terminal Cases and General Purpose Cases 12 Oct 09 1.0 Common Standard Y   S W V N Q
SCP 22 Small Buildings, Location Cases, Terminal Cases and General Purpose Cases 14 Mar 05 1.2 NSW Standard           N Q
ESC-07-04 Installation of Equipment Racks and Termination of Cables and Wiring 12 Oct 09 1.0 Common Standard Y   S W V N Q
SCP 20 Installation of Equipment Racks and Termination of Cables and Wiring 14 Mar 05 1.2 NSW Standard           N Q
SCP 02 Traction Return, Track Insulating and Bonding - Superseded by ESD-07-02 14 Mar 05 1.2 NSW Standard              
Power Supply
ESC-09-02 Lightning and Surge Protection Requirements 12 Oct 09 1.0 Common Standard Y   S W V N Q
SCP 04 Lightning and Surge Protection Requirements 14 Mar 05 1.2 NSW Standard           N Q
Communications for Signalling
PP-165.2 New Signal Locations without Signal Post Telephones 03 May 06 1.0 Process Procedure     S W V N Q
Cable and Line Route
ESC-11-01 Construction of Cable Route and Associated Civil Works 13 Aug 10 1.2 Common Standard Y   S W V N Q
SC 09 01 Construction of Cable Route and Associated Civil Works - Superseded by ESC-11-01 15 Jun 09 1.0 Common Standard              
SCP 21 Construction of Cable Route and Associated Civil Works 24 Jun 10 1.3 NSW Standard              
Commissioning
ESC-21-01 Inspection and Testing of Signalling - Roles, Responsibilities and Authorities 13 Aug 10 1.2 Common Standard Y   S W V N Q
ESC-21-02 Inspection and Testing of Signalling - Plans, Programs, Documentation and Packages 13 Aug 10 1.2 Common Standard Y   S W V N Q
ESC-21-03 Inspection and Testing of Signalling - Inspection and Testing Principles 13 Aug 10 1.2 Common Standard Y   S W V N Q
ESC-21-04 Inspection and Testing of Signalling - Standard Forms 13 Aug 10 1.2 Common Standard Y   S W V N Q
S2 S2 Signals - Commissioning - Superseded by ESC-21-01 and ESC-21-02 04 May 99 1.1 SA/WA Specification              
SCP 07 Inspection and Testing of New and Altered Signalling Works - Roles, Responsibilities, Plans, Programs and Packages - Superseded by ESC-21-01 and ESC-21-02 14 Mar 05 1.2 NSW Standard              
SCP 08 Inspection and Testing of New and Altered Signalling Works - General Requirements - Superseded by ESC-21-03 14 Mar 05 1.2 NSW Standard              
SCP 09 Inspection and Testing of New and Altered Signalling Works - Inspection and Testing Procedures - Superseded by ESC-21-03 14 Mar 05 1.2 NSW Standard              
SCP 10 Inspection and Testing of New and Altered Signalling Works - Typical Inspections and Tests for Signalling Apparatus - Superseded by ESC-21-03 08 Mar 07 1.3 NSW Standard              
SCP 11 Inspection and Testing of New and Altered Signalling Works - Standard Forms - Superseded by ESC-21-04 29 Mar 06 1.0 NSW Standard              
SCP 12 Typical Inspections and Tests for Signalling Apparatus - Procedures for Alterations - Superseded by ESC-21-03 14 Mar 05 1.2 NSW Standard              

Configurationback to top

Number Title Last Updated Version
Document Type
Commentary
Issues Register
Applicability
       
(under current document structure)
SA (S)
WA (W)
VIC (V)
NSW (N)
QLD (Q)
General
PP-130 Control of Software Configuration for Signalling and Communications Systems 21 Dec 06 1.4 Process Procedure     S W V    
PP-144 Collection of Signalling System Condition Data 09 Aug 04 1.3 Process Procedure     S W V N Q
PP-145 Collection of Communications System Condition Data 12 Jan 04 1.2 Process Procedure     S W V N Q

Examinationback to top

Number Title Last Updated Version
Document Type
Commentary
Issues Register
Applicability
       
(under current document structure)
SA (S)
WA (W)
VIC (V)
NSW (N)
QLD (Q)
Field Equipment: Track Circuits, Trackside Equipment
SES 01 DC Track Circuits - Set-up Test and Certification 11 Jun 10 1.3 NSW Standard           N Q
SES 02 AC Immune DC Track Circuits Set-Up, Test and Certification 16 Jun 10 1.3 NSW Standard           N Q
SES 03 Jeumont-Schneider Impulse Track Circuits - Set-up, Test and Certification 06 Aug 10 1.3 NSW Standard           N Q
SES 04 AC Single Rail Track Circuits - Set-up, Test and Certification 16 Jun 10 1.3 NSW Standard           N Q
SES 05 AC Double Rail Track Circuits - Set-up, Test and Certification 16 Jun 10 1.3 NSW Standard           N Q
SES 06 CSEE UM 71 AF Jointless Track Circuits - Set-up, Test and Certification 06 Aug 10 1.3 NSW Standard           N Q
SES 07 WB&S FS2500 AF Jointless Track Circuits - Set-up, Test and Certification 18 Jun 10 1.3 NSW Standard           N Q
SES 08 ML T121 AF Jointless Track Circuits - Set-up, Test and Certification 18 Jun 10 1.3 NSW Standard           N Q

Maintenanceback to top

Number Title Last Updated Version
Document Type
Commentary
Issues Register
Applicability
       
(under current document structure)
SA (S)
WA (W)
VIC (V)
NSW (N)
QLD (Q)
General
ESM-00-01 Signal Inspection 23 Jan 18 1.3 Common Standard Y   S W V N Q
ESM-00-02 Failures 13 Aug 10 1.2 Common Standard Y   S W V N Q
ESM-00-03 Signalling Irregularities and Wrong Side Failures 13 Aug 10 1.2 Common Standard Y   S W V N Q
ESM-00-04 Management of Signalling and Control System Failures 13 Aug 10 1.2 Common Standard Y   S W V N Q
ESM-00-05 Damage to Signalling and Level Crossing Equipment 13 Aug 10 1.2 Common Standard Y   S W V N Q
ESM-00-06 Damage to Signalling and Level Crossing Equipment 13 Aug 10 1.2 Common Standard Y   S W V N Q
ESM-00-10 Testing and Certifying Equipment Worked on or Altered During Maintenance 13 Aug 10 1.3 Common Standard Y   S W V N Q
ESM-00-12 Disconnection of Signalling Apparatus 13 May 16 1.0 Procedure Y         N  
ESM-00-20 Like for Like Renewals 19 Sep 16 1.1 Procedure Y   S W V N Q
ESI-06-03N Inspection of Point Claw Locking Brackets 13 Apr 06 1.0 Engineering Instruction     S W V N Q
ESI-06-04A Westinghouse LED Signal Modules 10 Jul 06 1.0 Engineering Instruction     S W V N Q
ESI-04-01 Westinghouse Signal LED Module Failure 19 Aug 13 1.0 Engineering Instruction     S W V N Q
ESI-06-07 Track Circuit Resistors 08 Nov 06 1.0 Engineering Instruction     S W V N Q
ESI-07-01 Irregular Operation of Westinghouse Releasing Switch 13 Apr 07 1.0 Engineering Instruction     S W V N Q
PP-148 Signals Fault Management 02 Nov 08 1.3 Process Procedure     S W V N Q
S3 S3 Signals - Inspection and Assessment - Superseded by ESM-00-05 and ESM-26-01 04 May 99 2.1 SA/WA Specification              
S4 S4 Signals - Work on Asset 04 May 99 1.1 SA/WA Specification     S W      
SMP 01 Introduction to Signalling Maintenance Procedures 14 Mar 05 1.2 NSW Standard           N Q
SMP 03 Accidents or Derailments - Action to be Taken 14 Mar 05 1.2 NSW Standard           N Q
SMP 04 Failures 8 Jun 10 1.4 NSW Standard           N Q
SMP 05 Damage to Signalling Equipment Out of Use - Superseded by ESM-00-05 and ESM-00-06 14 Mar 05 1.1 NSW Standard           N Q
SMP 06 Release of Track Locking or Indication Locking 14 Mar 05 1.1 NSW Standard           N Q
SMP 07 Apparatus Seldom Used 14 Mar 05 1.2 NSW Standard           N Q
SMP 08 Booking Signalling Equipment Out of Use 14 Mar 05 1.2 NSW Standard           N Q
SMP 09 Disconnection of Signalling Apparatus (Superseded by ESM-00-12 24 Apr 08 1.3 Procedure           N  
SMP 10 Testing and Certifying Equipment Worked on or Altered During Maintenance 24 Jun 10 1.4 NSW Standard           N Q
SMP 11 Like for Like Replacement - (Superseded by ESM-00-20) 14 Mar 05 1.2 NSW Standard           N Q
SMP 12 Repair/Replacement of Signalling Wires 14 Mar 05 1.1 NSW Standard           N Q
SMP 13 Field Paralleling of Signalling Contacts 14 Mar 05 1.1 NSW Standard           N Q
SMP 14 Document Control of Signal Plans and Circuit Books Issued to the Field 14 Mar 05 1.2 NSW Standard           N Q
SMP 16 Notification of Whereabouts and Liaison with Signallers 14 Mar 05 1.2 NSW Standard           N Q
SMP 18 Depot Overhaul of Vital Signalling Equipment 14 Mar 05 1.2 NSW Standard           N Q
SMP 19 Cleanliness and Lubrication of Mechanical Signalling Equipment 14 Mar 05 1.1 NSW Standard           N Q
SMP 20 Security, Fire Protection, Weather Proofing and Cleanliness of Signalling Equipment, Housings and Locations 14 Mar 05 1.1 NSW Standard           N Q
SMP 21 Minor Signalling Works on Maintenance Areas Involving Removal or Altering of Signalling Equipment 14 Mar 05 1.2 NSW Standard           N Q
SMP 23 Insulation Inspection and Testing
Superseded by ESM-11-01
15 Nov 07 1.3 NSW Standard           N Q
SMP 24 Vital Signalling Relays
Superseded by ESM-05-11
14 Mar 05 1.2 NSW Standard           N Q
SMP 26 Re-railing - Precautions to be Taken 14 Mar 05 1.2 NSW Standard           N Q
SMP 27 Traction Return (1500V DC) 14 Mar 05 1.1 NSW Standard           N Q
SMP 40 Use of Radio Transmitters Near Electronic Signalling Systems 14 Mar 05 1.1 NSW Standard           N Q
SMP 41 Pole Route 14 Mar 05 1.2 NSW Standard           N Q
SMP 43 Guidelines for Irregularity Inspection and Testing to Determine Cause 14 Mar 05 1.2 NSW Standard           N Q
SMP 44 General Signalling Maintenance Management, Administration and Supervision Responsibilities 14 Mar 05 1.1 NSW Standard              
SMP 45 Surveillance Inspections - Superseded by ESM-00-01 14 Mar 05 1.2 NSW Standard           N Q
SMP 46 Guidelines for the Safe Use of Temporary Recording, Monitoring and Logging Equipment on Signalling Systems 14 Mar 05 1.2 NSW Standard           N Q
SMP 47 Calibration of Tools and Instruments for Signalling Application 14 Mar 05 1.2 NSW Standard           N Q
Level Crossings
ESI-05-01N Level Crossing Monitor - Hardware Reset 20 Dec 05 1.0 Engineering Instruction     S W V N Q
SMP 36 Level Crossings 14 Mar 05 1.2 NSW Standard           N Q
SMS 02 Cerberus Level Crossing Monitoring Equipment 14 Mar 05 1.2 NSW Standard           N Q
SMS 13 Road Level Crossing Protection Equipment 14 Mar 05 1.2 NSW Standard           N Q
SMS 14 Pedestrian Level Crossing Protection Equipment 14 Mar 05 1.1 NSW Standard           N Q
Signals
ESM-04-01 Maintenance and Sighting of Semaphore Signals and Train Authority Indicators 13 Aug 10 1.3 Common Standard Y   S W V N Q
SMP 31 Maintenance of Signal Sighting and Signals 02 Jun 10 1.3 NSW Standard           N Q
Interlockings, CBI Field Equipment
ESM-05-01 Testing of Interlockings - Maintenance Responsibilities 13 Aug 10 1.2 Common Standard Y   S W V N Q
ESM-05-11 Vital Signal Relays 20 Jan 17 1.1 Common Standard Y   S W V N Q
ESI-05-15 Work Instruction for Testing BR930 Series Relays using the MRD RelayDoc Test Tool 20 Jan 17 1.0 Work Instruction Y   S W V N Q
SMP 22 Testing Interlockings - Maintenance Responsibilities - Superseded by ESM-05-01 14 Mar 05 1.2 NSW Standard              
SMP 32 Solid State Interlocking (SSI) 14 Mar 05 1.2 NSW Standard           N Q
SMP 38 Microlok Computer Based Interlocking 14 Mar 05 1.2 NSW Standard           N Q
SMP 39 Westrace Computer Based Interlocking 14 Mar 05 1.2 NSW Standard           N Q
Points, Release Switches
ESM-06-01 Facing Point Lock and Detection Testing 13 Aug 10 1.3 Common Standard Y   S W V N Q
SMP 28 Points Detection Test - Separate Electrical - Superseded by ESM-06-01                    
SMP 29 Facing Point Lock Testing - Mechanical - Superseded by ESM-06-01                    
SMP 30 Facing Point Lock and Detection Testing - Combined Point Machine 02 Jun 10 1.3 NSW Standard           N Q
SMS 04 Mechanical Points and Ground Frames 14 Mar 05 1.2 NSW Standard           N Q
SMS 03 Electro-Pneumatic Points - Styles Control Valve 14 Mar 05 1.1 NSW Standard           N Q
SMS 05 The Claw Lock Mechanism - Description and Operation 14 Mar 05 1.2 NSW Standard           N Q
SMS 06 The Claw Lock Mechanism - Safety and Functional Test Routine Maintenance 14 Mar 05 1.2 NSW Standard           N Q
SMS 07 The Claw Lock Mechanism - Overhaul 14 Mar 05 1.1 NSW Standard           N Q
SMS 08 The Claw Lock Mechanism - Installation of Turnouts 14 Mar 05 1.1 NSW Standard           N Q
SMS 09 The Claw Lock Mechanism - Installation on Swing Nose Crossings 14 Mar 05 1.1 NSW Standard           N Q
SMS 10 The Claw Lock Mechanism - Installation on Switch Rollers 14 Mar 05 1.1 NSW Standard           N Q
ESI-06-01 Claw Lock Failure 08 Oct 14 1.0 Engineering Instruction     S W V N Q
Field Equipment: Track Circuits, Trackside Equipment
ESM-07-01 Track Circuits 13 Aug 10 1.2 Common Standard Y   S W V N Q
ESM-07-02 Track Circuits and Train Detection Devices 13 Aug 10 1.2 Common Standard Y   S W V N Q
ESM-07-03 Microtrax Coded Track Circuits 13 Aug 10 1.3 Common Standard Y   S W V N Q
SMP 15 Location of Track Side Equipment 14 Mar 05 1.2 NSW Standard           N Q
SMP 25 Track Circuits - Superseded by ESM-07-01 and ESM-07-02 14 Mar 05 1.2 NSW Standard              
SMP 37 Microtrax Coded Track Circuits 02 Jun 10 1.3 NSW Standard           N Q
SMS 01 Track Side Monitoring Equipment 14 Mar 05 1.2 NSW Standard           N Q
SMS 11 Jeumont Schneider Track Circuits 14 Mar 05 1.1 NSW Standard           N Q
SMS 12 Westinghouse FS 2600 Manual 14 Mar 05 1.1 NSW Standard              
Train Authority Systems, Train Order Systems, Token and Tokenless Block
ESM-08-01 Electric Train Staff Instruments 13 Aug 10 1.2 Common Standard Y   S W V N Q
SMP 33 Electrical Train Staff Instruments - Superseded by ESM-08-01 13 Nov 07 1.3 NSW Standard              
SMP 34 Custody, Storage and Despatch of Staff and Keys 14 Mar 05 1.1 NSW Standard           N Q
SMP 35 Use of Master Keys and Staffs 14 Mar 05 1.2 NSW Standard           N Q
Power Supply
SMP 42 Work on Signalling Power Mains 14 Mar 05 1.2 NSW Standard           N Q
Communications for Signalling
PP-149 Communications Fault Management 12 Jan 04 1.2 Process Procedure     S W V N Q
PP-165.1 Removal of Signal Post Telephones 03 May 06 1.0 Process Procedure     S W V N Q
Cable and Line Route
ESM-11-01 Insulation Inspection & Testing 29 Jan 15 1.0 Common Standard Y   S   V N Q
ESI-11-10 ELD Routine Testing 29 Jan 15 1.0 Engineering Instruction     S   V N Q
ESI-11-11 Surge Protection Testing 29 Jan 15 1.0 Engineering Instruction     S   V N Q
ESI-11-12 Testing Microprocessor Signals Equipment 29 Jan 15 1.0 Engineering Instruction     S   V N Q
In Service
ESM-24-01 Bridging or False Feeding Signalling Circuits 13 Aug 10 1.2 Common Standard Y   S W V N Q
SMP 02 Bridging or False Feeding of Signalling Circuits - Superseded by ESM-24-01 14 Mar 05 1.2 Common Standard              
Maintenance Plans
PP-150 Maintenance Plan Development for Signalling 12 Jan 04 1.2 Process Procedure     S W V N Q
ESM-26-01 Maintenance Responsibilities, Frequencies, Recording 13 Aug 10 1.2 Common Standard Y Y S W V N Q
ESM-26-02 Signals Technical Maintenance Plan
Note, this v1.4 remains current until version 3.0 is progressively implemented by Provisioning Centre.
24 Feb 14 1.4 Common Standard Y   S W V N Q
ESM2602-S01-S02-S03 Signals Technical Maintenance Plan
Note – This Procedure supports ESM-26-02 v1.4 and remains current until version 3.0 is progressively implemented by Provisioning Centre.
02 Aug 14 2.0 Procedure     S W V N Q
ESM-26-02 Signals Technical Maintenance Plan
Note, this version 3.0  is being progressively implemented by Provisioning Centre.
19 Jul 18 3.0 Common Standard     S W V N Q
ESM-26-03 Signal Maintenance Latitude 13 Aug 18 1.5 Common Standard Y   S W V N Q
ESM-26-04 Signal Service Schedule Index 02 Aug 13 1.3 Common Standard Y   S W V N Q
SMP 17 Maintenance Responsibilities, Frequencies, Recording - Superseded by ESM-26-01 14 Mar 05 1.2 NSW Standard              
SMS 15 Signalling Technical Maintenance Plan - Superseded by ESM-26-02, ESM-26-03 and ESM-26-04 14 Mar 05 1.2 NSW Standard              
SMS 16 Service Schedule Index - Superseded by ESM-26-04 14 Mar 05 1.2 NSW Standard              

Trainingback to top

Number Title Last Updated Version
Document Type
Commentary
Issues Register
Applicability
       
(under current document structure)
SA (S)
WA (W)
VIC (V)
NSW (N)
QLD (Q)
Staff Competency and Training
EST-20-01 Signal Standards and Equipment Training Courses 13 Aug 10 1.2 Common Standard Y   S W V N Q
EST-20-02 Signals Staff Competency Assessment 13 Aug 10 1.2 Common Standard Y   S W V N Q
EST-20-03 Applying for Signals Competency 11 Feb 11 1.1 Work Instruction Y   S W V N Q
EST-20-05 Signals Competency - Training for a New Skill or Higher Competency Level 02 May 17 1.1 Common Standard Y   S W V N Q
ETD-20-02 Technical Note – Signals Rail Safety Worker Competence 25 Oct 16 1.0 Technical Note     S W V N Q