Signalling: Procedures
For assistance, email standards@artc.com.au or visit the Engineering Help pages. To report an issue in an engineering document or propose a change, please complete EGP0101F-02 Engineering Document Change Request and email this to standards@artc.com.au.
This page contains documents that are currently known as Policies, Procedures, Standards, Engineering Instructions and Specifications.
Where there is conflict between any Standards, Procedures or Specifications published, the Common Standards that are applicable network wide take precedence, unless otherwise indicated.
Engineering Instructions take precedence over Standards, Procedures and Specifications for that particular subject.
Signalling Procedures are published by document category which is based on the life cycle of the infrastructure and then by detail code which groups particular infrastructure elements together.
The State in which the document is applicable is shown in the Applicability table. Note, documents marked with NSW applicability also apply to QLD by default.
Generalback to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) |
WA (W) |
VIC (V) |
NSW (N) |
QLD (Q) |
||||||
General | |||||||||||
S5 | S5 Signals - Decommissioning | 04 May 99 | 1.1 | SA/WA Specification | S | W | |||||
SGS 01 | Glossary of Signalling Terms | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SGS 02 | Glossary of Terms | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
ESI-00-02 | Implementing Signalling Standards | 12 Feb 09 | 1.0 | Engineering Instruction | S | W | V | N | Q | ||
ESG-00-15 | ARTC Quality Controlled Supplier | 27 Nov 14 | 1.0 | Engineering Instruction | S | W | V | N | Q |
Designback to top
Number | Title | Last Updated | Version | Document Type |
Applicability | |||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) |
WA (W) |
VIC (V) |
NSW (N) |
QLD (Q) |
|||||||
General | ||||||||||||
ESI-05-14 | Signal Design and Maintenance of Configuration Information | 04 Jul 17 | 1.0 | Engineering Instruction | S | W | V | N | Q | |||
ESI-05-13 | Signal Design and Standards Applicability | 07 Mar 17 | 1.0 | Engineering Instruction | S | W | V | N | Q | |||
S1 | S1 Signals - Design and Rating | 13 Aug 10 | 3.0 | SA/WA Specification | S | W | ||||||
SDS 00 | Introduction | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
SCP 01 | Signalling Control Systems | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
SDS 05 | Speed Restrictions | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
SDS 06 | Notice Boards | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
SDS 07 | Single Line Sections | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
SDS 08 | Bi-Directional Signalling | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
SDS 15 | Train Stops | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
SDS 20 | Warning Lights | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
SDS 21 | Placing Signals at Stop to Protect a Worksite | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
ESD-00-02 | Measurement of Signalling Distances | 09 Jun 20 | 1.1 | Common Standard | S | W | V | N | Q | |||
ESD-08-03 | Placement of Yard Limit Signs | 09 May 12 | 1.0 | NSW Standard | N | Q | ||||||
SDS 25 | Signalling Circuit Design Standards | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
ESD-05-17 | Signalling Requirements for Dual Gauge Areas | 20 Oct 22 | 1.0 | Common Standard | S | W | V | N | Q | |||
Control, Indication, Monitors, Wayside Equipment | ||||||||||||
SDS 16 | Controls and Indications | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
Level Crossings | ||||||||||||
ESD-03-01 | Level Crossing Design | 04 Oct 22 | 1.5 | Common Standard | S | W | V | N | Q | |||
ESD-03-02 | Level Crossing Predictor Design Certification and Test | 14 Apr 22 | 1.3 | Common Standard | S | W | V | N | Q | |||
ESD-05-05 | Level Crossing Monitoring Requirements | 09 May 22 | 1.0 | Common Standard | S | W | V | N | Q | |||
Interlockings, CBI Field Equipment | ||||||||||||
ESD-05-01 | Common Signal Design Principles - S1 - Signalling Locking and Train Dynamics | 13 Oct 15 | 3.0 | Common Standard | S | W | V | N | Q | |||
ESD-05-03 | Train Braking Application Design | 04 Oct 18 | 1.1 | Common Standard | S | W | V | N | Q | |||
ESD-05-11 | Microlok Data Design Records (Addressing, File Control, Checking, and FAT Testing) | 17 Feb 14 | 1.3 | Common Standard | S | W | V | N | Q | |||
ESD-05-12 | Microlok II Design | 13 Aug 10 | 1.3 | Common Standard | S | W | V | N | Q | |||
ESI-05-11 | Microlok Address Management | 05 Feb 14 | 1.0 | Engineering Instruction | S | W | V | N | Q | |||
SCP 23 | Design of Microlok II Interlockings | 25 Jun 10 | 1.4 | NSW Standard | N | Q | ||||||
SDS 01 | Signals | 25 Aug 06 | 2.0 | NSW Standard | N | Q | ||||||
SDS 04 | Overlaps | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
SDS 13 | Local Control | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
Points, Release Switches | ||||||||||||
ESD-05-21 | Split Detection of Points (Hunter Valley Only) | 30 Jun 20 | 1.0 | Guideline | N | Q | ||||||
Field Equipment: Track Circuits, Trackside Equipment and Train Detection System | ||||||||||||
ESD-05-13 | Resetting of Frauscher Axle Counter Systems | 18 Jan 22 | 1.0 | Guideline | S | W | V | N | Q | |||
ESD-05-14 | Frauscher Axle Counter Systems | 18 Oct 21 | 1.0 | Common Standard | S | W | V | N | Q | |||
ESD-05-15 | Design of Frauscher Axle Counters | 15 Dec 21 | 1.0 | Guideline | S | W | V | N | Q | |||
ESD-07-01 | Points | 09 Oct 20 | 1.0 | Common Standard | S | W | V | N | Q | |||
ESD-07-02 | Track Bonding and Signalling Infrastructure in Electrified Areas | 13 Aug 10 | 1.2 | Common Standard | S | W | V | N | Q | |||
SDS 17 | Track Circuits | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
ESD-07-04 | Train Protection Warning System | 17 Oct 22 | 1.3 | Common Standard | S | W | V | N | Q | |||
Train Authority Systems, Train Order Systems, Token and Tokenless Block | ||||||||||||
ESD-08-01 | Train Order Working | 22 Dec 20 | 1.8 | Common Standard | S | W | V | N | Q | |||
ESS-08-01 | Advanced Train Management System Trackside Signalling Design Requirements (formerly ESD-08-02) This document has been relocated to the ATMS Tab on the Extranet |
|||||||||||
SDS 24 | Arrangement of Infrastructure at Signalling to Train Order and Token Area Boundaries | 14 Mar 05 | 1.2 | NSW Standard | N | Q | ||||||
Power Supply | ||||||||||||
ESS-09-01 | Solar Power Supply Systems (formerly ESD-09-02) | 18 Sep 23 | 1.1 | Standard | S | W | V | N | Q | |||
ESS-09-02 | Signalling Power Systems (formerly ESD-09-01) | 31 Oct 23 | 1.0 | Standard | S | W | V | N | Q | |||
Enclosures | ||||||||||||
ESA-12-01 | Pits requirements for Signalling Applications | 13 Jun 20 | 1.0 | Specification | S | W | V | N | Q | |||
Design Practices | ||||||||||||
ESD-25-01 | CAD and Drafting Manual for Signalling Drawings | 07 Sep 22 | 1.3 | Common Standard | S | W | V | N | Q | |||
ESD-25-03 | Signalling Documentation and Drawings | 07 Sep 22 | 1.0 | NSW Standard | N | Q | ||||||
Rolling Stock Interface | ||||||||||||
ESS-32-01 | Rolling Stock Signalling Interface (formerly ESD-32-01) | 15 Jun 23 | 1.0 | Standard | S | W | V | N | Q | |||
ESD-32-02 | ATMS Equipped Train Braking Standard This document has been relocated to the ATMS Tab on the Extranet |
Materialback to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) |
WA (W) |
VIC (V) |
NSW (N) |
QLD (Q) |
||||||
General | |||||||||||
SPS 02 | Environmental Conditions | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
ESA-07-01 | Signs, Notice Plates and Instruction Plates | 04 Feb 19 | 1.1 | NSW Standard | N | Q | |||||
SPS 04 | General Requirements for Labelling of Equipment | 06 May 05 | 1.2 | NSW Standard | N | Q | |||||
SPS 05 | Electrical and Electronic Components (Ratings and Construction Requirements) | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 06 | Connectors for Signalling Interface | 06 May 05 | 1.2 | NSW Standard | N | Q | |||||
SPS 07 | Vital Indication Optoisolator | 06 May 05 | 1.2 | NSW Standard | N | Q | |||||
SPS 09 | Battery Voltage Monitor and Alarm | 06 May 05 | 1.2 | NSW Standard | N | Q | |||||
SPS 10 | Relays Plug-in Vital | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
ESA-04-01 | Colourlight Signals and Indicators | 10 Feb 23 | 1.0 | Network Wide | S | W | V | N | Q | ||
SPS 12 | Signal Lamps | 06 May 05 | 1.2 | NSW Standard | N | Q | |||||
SPS 13 | Electro-pneumatic Train Stops | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 14 | Hydraulic Train Stops | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 16 | Point Mechanisms | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 17 | 6 ohm Track Resistor | 06 May 05 | 1.2 | NSW Standard | N | Q | |||||
SPS 18 | Centre-tapped Electrolysis Bond Chokes (30ARAIL) | 06 May 05 | 1.2 | NSW Standard | N | Q | |||||
SPS 19 | Impedance Boards | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 23 | Single Phased Air Cooled, Isolating Transformer for Signalling Applications | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 24 | Emergency Changeover Contactor Panel | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 25 | High Speed Emergency Changeover Contactor Panel | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
ESA-09-03 | Mains Failure Plant | 04 Oct 22 | 1.1 | Specification | S | W | V | N | Q | ||
SPS 32 | Fuses For Railway Signalling Applications | 06 May 05 | 1.2 | NSW Standard | N | Q | |||||
SPS 33 | Solderless Terminals - Cable Lugs for Signalling Applications | 06 May 05 | 1.2 | NSW Standard | N | Q | |||||
SPS 51 | Solderless Terminals Screw and Sprint Clamp Terminal Blocks | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
ESA-00-01 | Approved Signalling Items for the ARTC Network | 24 Apr 23 | 1.6 | Specification | S | W | V | N | Q | ||
Remote Control, Control Systems | |||||||||||
SPS 01 | Standard Requirements for Signalling Electronic Systems | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
Field Equipment: Track Circuits, Trackside Equipment | |||||||||||
SPS 20 | High Voltage Impulse Track Circuits | 06 May 05 | 1.2 | NSW Standard | N | Q | |||||
SPS 21 | Audio Frequency Jointless Track Circuits for Main Line | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
Power Supply | |||||||||||
ESA-09-05 | DC Power Supply Units and Battery Charger Power Supplies for Signalling Equipment | 28 May 23 | 1.0 | Specification | S | W | V | N | Q | ||
SPS 34 | Lightning/Surge Protection - Inductor/Varistor Panel | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 35 | Lightning/Surge Protection - Varistor/Arrestor Panel (Vap) | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 36 | Lightning/Surge Protection - Varistor Panel | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 37 | Lightning/Surge Protection - Power Inductors | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 38 | Lightning/Surge Protection for Communication Lines LPU | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 39 | Lightning/Surge Protection Inductor/Diverter Panel | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
Cable and Line Route | |||||||||||
ESA-11-01 | Cables for Railway Signalling Applications - General Requirements | 08 Nov 22 | 2.4 | Common Standard | S | W | V | N | Q | ||
ESA-11-03 | Specification for Cable Jointing Material (formerly SPS 41) | 04 Apr 23 | 1.0 | Specification | S | W | V | N | Q | ||
SPS 46 | Cables for Railway Signalling Applications - Fire Safe High Frequency Screened Track Circuit Cable | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 48 | Cables for Railway Signalling Applications - High Frequency Screened Track Circuit Cables | 06 May 05 | 1.3 | NSW Standard | N | Q | |||||
SPS 49 | Cables for Railway Signalling Applications - Traction Return Bonding And Track Connection Cables | 10 Feb 15 | 1.3 | NSW Standard | N | Q |
Constructionback to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) |
WA (W) |
VIC (V) |
NSW (N) |
QLD (Q) |
||||||
General | |||||||||||
SCP 05 | Signalling Electronic Systems Verification | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SCP 16 | Signalling Operator Interface | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SCP 19 | Air Reticulation Systems | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
Level Crossings | |||||||||||
ESC-03-01 | Level Crossing Construction | 04 Oct 22 | 1.4 | Common Standard | S | W | V | N | Q | ||
Signals | |||||||||||
ESC-04-01 | Signal Sighting and Position | 27 Oct 10 | 1.4 | Common Standard | S | W | V | N | Q | ||
ESC-04-02 | Post Mounted Signals - Ladders | 13 Aug 10 | 1.2 | Common Standard | S | W | V | N | Q | ||
Interlockings, CBI Field Equipment | |||||||||||
SCP 17 | Computer Based Interlocking Requirements | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
Field Equipment: Track Circuits, Trackside Equipment | |||||||||||
ESC-07-01 | Installation of Trackside Equipment | 14 Feb 22 | 1.4 | Common Standard | S | W | V | N | Q | ||
ESC-07-03 | Small Buildings, Location Cases, Terminal Cases and General Purpose Cases | 12 Oct 09 | 1.0 | Common Standard | S | W | V | N | Q | ||
SCP 22 | Small Buildings, Location Cases, Terminal Cases and General Purpose Cases | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
ESC-07-04 | Installation of Equipment Racks and Termination of Cables and Wiring | 12 Nov 19 | 1.2 | Common Standard | S | W | V | N | Q | ||
SCP 20 | Installation of Equipment Racks and Termination of Cables and Wiring | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
Power Supply | |||||||||||
ESC-09-02 | Lightning and Surge Protection Requirements | 12 Oct 09 | 1.0 | Common Standard | S | W | V | N | Q | ||
SCP 04 | Lightning and Surge Protection Requirements | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
Communications for Signalling | |||||||||||
PP-165.2 | New Signal Locations without Signal Post Telephones This document has been relocated to the Communications Tab on the Extranet |
||||||||||
ESC-10-01 | Network Switch, Router and Modem requirements for Signalling Applications This document has been relocated to the Communications Tab on the Extranet |
||||||||||
Cable and Line Route | |||||||||||
ESC-11-01 | Construction of Cable Route and Associated Civil Works | 13 Aug 10 | 1.2 | Common Standard | S | W | V | N | Q | ||
SCP 21 | Construction of Cable Route and Associated Civil Works | 24 Jun 10 | 1.3 | NSW Standard | N | Q | |||||
Commissioning | |||||||||||
ESC-21-01 | Inspection and Testing of Signalling - Roles, Responsibilities and Authorities | 15 Sep 21 | 1.4 | Common Standard | S | W | V | N | Q | ||
ESC-21-02 | Inspection and Testing of Signalling - Plans, Programs, Documentation and Packages | 07 Sep 22 | 1.3 | Common Standard | S | W | V | N | Q | ||
ESC-21-03 | Inspection and Testing of Signalling - Inspection and Testing Principles | 13 Aug 10 | 1.2 | Common Standard | S | W | V | N | Q | ||
ESC-21-04 | Inspection and Testing of Signalling - Standard Forms | 17 Oct 22 | 1.3 | Common Standard | S | W | V | N | Q |
Configurationback to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) |
WA (W) |
VIC (V) |
NSW (N) |
QLD (Q) |
||||||
General | |||||||||||
PP-130 | Control of Software Configuration for Signalling and Communications Systems | 21 Dec 06 | 1.4 | Process Procedure | S | W | V | ||||
PP-144 | Collection of Signalling System Condition Data | 09 Aug 04 | 1.3 | Process Procedure | S | W | V | N | Q | ||
PP-145 | Collection of Communications System Condition Data This document has been relocated to the Communications Tab on the Extranet |
Examinationback to top
Maintenanceback to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) |
WA (W) |
VIC (V) |
NSW (N) |
QLD (Q) |
||||||
General | |||||||||||
ESM-00-01 | Signal Inspection | 09 Jan 19 | 1.4 | Common Standard | S | W | V | N | Q | ||
ESM-00-02 | Failures | 13 Aug 10 | 1.2 | Common Standard | S | W | V | N | Q | ||
ESM-00-03 | Signalling Irregularities and Wrong Side Failures | 13 Aug 10 | 1.2 | Common Standard | S | W | V | N | Q | ||
ESM-00-04 | Management of Signalling and Control System Failures | 13 Aug 10 | 1.2 | Common Standard | S | W | V | N | Q | ||
ESM-00-10 | Testing and Certifying Equipment Worked on or Altered During Maintenance | 13 Aug 10 | 1.3 | Common Standard | S | W | V | N | Q | ||
ESM-00-12 | Disconnection of Signalling Apparatus | 13 May 16 | 1.0 | Procedure | N | ||||||
ESM-00-20 | Like for Like Renewals | 19 Sep 16 | 1.1 | Procedure | S | W | V | N | Q | ||
ESS-00-01 | Rerailing – Precautions to be Taken (formerly ESM-00-13) | 24 Jul 23 | 1.0 | Standard | S | W | V | N | Q | ||
ESI-06-03N | Inspection of Point Claw Locking Brackets | 13 Apr 06 | 1.0 | Engineering Instruction | S | W | V | N | Q | ||
ESI-06-04A | Westinghouse LED Signal Modules | 10 Jul 06 | 1.0 | Engineering Instruction | S | W | V | N | Q | ||
ESI-04-01 | Westinghouse Signal LED Module Failure | 19 Aug 13 | 1.0 | Engineering Instruction | S | W | V | N | Q | ||
ESI-06-07 | Track Circuit Resistors | 08 Nov 06 | 1.0 | Engineering Instruction | S | W | V | N | Q | ||
ESI-07-01 | Irregular Operation of Westinghouse Releasing Switch | 13 Apr 07 | 1.0 | Engineering Instruction | S | W | V | N | Q | ||
PP-148 | Signals Fault Management | 02 Nov 08 | 1.3 | Process Procedure | S | W | V | N | Q | ||
S4 | S4 Signals - Work on Asset | 04 May 99 | 1.1 | SA/WA Specification | S | W | |||||
SMP 01 | Introduction to Signalling Maintenance Procedures | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMP 03 | Accidents or Derailments - Action to be Taken | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMP 04 | Failures | 8 Jun 10 | 1.4 | NSW Standard | N | Q | |||||
SMP 06 | Release of Track Locking or Indication Locking | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMP 07 | Apparatus Seldom Used | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMP 08 | Booking Signalling Equipment Out of Use | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMP 10 | Testing and Certifying Equipment Worked on or Altered During Maintenance | 24 Jun 10 | 1.4 | NSW Standard | N | Q | |||||
SMP 12 | Repair/Replacement of Signalling Wires | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMP 13 | Field Paralleling of Signalling Contacts | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMP 14 | Document Control of Signal Plans and Circuit Books Issued to the Field | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMP 16 | Notification of Whereabouts and Liaison with Signallers | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMP 18 | Depot Overhaul of Vital Signalling Equipment | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMP 19 | Cleanliness and Lubrication of Mechanical Signalling Equipment | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMP 20 | Security, Fire Protection, Weather Proofing and Cleanliness of Signalling Equipment, Housings and Locations | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMP 21 | Minor Signalling Works on Maintenance Areas Involving Removal or Altering of Signalling Equipment | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMP 27 | Traction Return (1500V DC) | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMP 40 | Use of Radio Transmitters Near Electronic Signalling Systems | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMP 41 | Pole Route | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMP 43 | Guidelines for Irregularity Inspection and Testing to Determine Cause | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMP 44 | General Signalling Maintenance Management, Administration and Supervision Responsibilities | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMP 46 | Guidelines for the Safe Use of Temporary Recording, Monitoring and Logging Equipment on Signalling Systems | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
ESH-00-07 | Tools and Instruments for Signalling Application | 22 Jan 21 | 1.0 | Guideline | S | W | V | N | Q | ||
Level Crossings | |||||||||||
ESM-03-01 | Level Crossing and Pedestrian Crossing Maintenance | 06 Sep 22 | 1.2 | Common Standard | S | W | V | N | Q | ||
Signals | |||||||||||
ESM-04-01 | Maintenance and Sighting of Semaphore Signals and Train Authority Indicators | 13 Aug 10 | 1.3 | Common Standard | S | W | V | N | Q | ||
SMP 31 | Maintenance of Signal Sighting and Signals | 02 Jun 10 | 1.3 | NSW Standard | N | Q | |||||
Interlockings, CBI Field Equipment | |||||||||||
ESI-05-15 | Work Instruction for Testing BR930 Series Relays using the MRD RelayDoc Test Tool | 20 Jan 17 | 1.0 | Work Instruction | S | W | V | N | Q | ||
ESM-05-01 | Testing of Interlockings - Maintenance Responsibilities | 13 Aug 10 | 1.2 | Common Standard | S | W | V | N | Q | ||
ESP-05-02 | Vital Signal Relays | 13 Sep 23 | 1.0 | Procedure | S | W | V | N | Q | ||
SMP 32 | Solid State Interlocking (SSI) | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMP 38 | Microlok Computer Based Interlocking | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMP 39 | Westrace Computer Based Interlocking | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
Points, Release Switches | |||||||||||
SMS 04 | Mechanical Points and Ground Frames | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMS 03 | Electro-Pneumatic Points - Styles Control Valve | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMS 05 | The Claw Lock Mechanism - Description and Operation | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMS 06 | The Claw Lock Mechanism - Safety and Functional Test Routine Maintenance | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMS 07 | The Claw Lock Mechanism - Overhaul | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMS 08 | The Claw Lock Mechanism - Installation of Turnouts | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMS 09 | The Claw Lock Mechanism - Installation on Swing Nose Crossings | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMS 10 | The Claw Lock Mechanism - Installation on Switch Rollers | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
ESI-06-01 | Claw Lock Failure | 08 Oct 14 | 1.0 | Engineering Instruction | S | W | V | N | Q | ||
ESS-06-01 | Facing Point Lock and Detection Testing | 13 Nov 23 | 1.0 | Standard | S | W | V | N | Q | ||
Field Equipment: Track Circuits, Trackside Equipment | |||||||||||
ESI-07-08 | Asbestos Risk for Signalling Personnel - UM71 Track Circuits | 12 Sep 22 | 1.0 | Engineering Instruction | S | W | V | N | Q | ||
ESM-07-02 | Track Circuits and Train Detection Devices | 19 Nov 20 | 1.3 | Common Standard | S | W | V | N | Q | ||
ESM-07-03 | Microtrax Coded Track Circuits | 13 Aug 10 | 1.3 | Common Standard | S | W | V | N | Q | ||
ESM-07-04 | Unreliable Track Circuit due to Infrequent Train Operations | 18 Nov 20 | 1.0 | Common Standard | S | W | V | N | Q | ||
SMP 15 | Location of Track Side Equipment | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMP 37 | Microtrax Coded Track Circuits | 02 Jun 10 | 1.3 | NSW Standard | N | Q | |||||
SMS 01 | Track Side Monitoring Equipment | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
SMS 11 | Jeumont Schneider Track Circuits | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMS 12 | Westinghouse FS 2600 Manual | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
Train Authority Systems, Train Order Systems, Token and Tokenless Block | |||||||||||
ESM-08-01 | Electric Train Staff Instruments | 13 Aug 10 | 1.2 | Common Standard | S | W | V | N | Q | ||
SMP 34 | Custody, Storage and Despatch of Staff and Keys | 14 Mar 05 | 1.1 | NSW Standard | N | Q | |||||
SMP 35 | Use of Master Keys and Staffs | 14 Mar 05 | 1.2 | NSW Standard | N | Q | |||||
Power Supply | |||||||||||
ESM-09-01 | Work on Signalling Power Mains | 25 Jun 21 | 1.0 | Standard | S | W | V | N | Q | ||
Communications for Signalling | |||||||||||
PP-149 | Communications Fault Management This document has been relocated to the Communications Tab on the Extranet |
||||||||||
PP-165.1 | Removal of Signal Post Telephones This document has been relocated to the Communications Tab on the Extranet |
||||||||||
Cable and Line Route | |||||||||||
ESM-11-01 | Insulation Inspection & Testing | 24 May 21 | 1.2 | Common Standard | S | V | N | Q | |||
ESI-11-10 | ELD Routine Testing | 29 Jan 15 | 1.0 | Engineering Instruction | S | V | N | Q | |||
ESI-11-11 | Surge Protection Testing | 29 Jan 15 | 1.0 | Engineering Instruction | S | V | N | Q | |||
ESI-11-12 | Testing Microprocessor Signals Equipment | 29 Jan 15 | 1.0 | Engineering Instruction | S | V | N | Q | |||
In Service | |||||||||||
ESM-24-01 | Bridging or False Feeding Signalling Circuits | 16 Nov 21 | 1.4 | Common Standard | S | W | V | N | Q | ||
Maintenance Plans | |||||||||||
PP-150 | Maintenance Plan Development for Signalling | 12 Jan 04 | 1.2 | Process Procedure | S | W | V | N | Q | ||
ESM-26-02 | Signals Technical Maintenance Plan | 12 Oct 22 | 3.4 | Common Standard | S | W | V | N | Q |
Trainingback to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) |
WA (W) |
VIC (V) |
NSW (N) |
QLD (Q) |
||||||
Staff Competency and Training | |||||||||||
EST-20-01 | Signal Standards and Equipment Training Courses | 13 Aug 10 | 1.2 | Common Standard | S | W | V | N | Q | ||
EST-20-02 | Signals Staff Competency Assessment | 13 Aug 10 | 1.2 | Common Standard | S | W | V | N | Q | ||
EST-20-03 | Applying for Signals Competency | 09 Mar 21 | 2.0 | Work Instruction | S | W | V | N | Q | ||
EST-20-05 | Signals Competency - Training for a New Skill or Higher Competency Level | 02 May 17 | 1.1 | Common Standard | S | W | V | N | Q | ||
ETD-20-02 | Technical Note – Signals Rail Safety Worker Competence | 25 Oct 16 | 1.0 | Technical Note | S | W | V | N | Q |