Signalling: Work Instructions

For assistance, email standards@artc.com.au or visit the Engineering Help pages. To report an issue in an engineering document or propose a change, please complete EGP0101F-02 Engineering Document Change Request and email this to standards@artc.com.au.

This page contains documents that are currently known as Manuals, Work Instructions and Service Schedules.

Signalling Work Instructions are published by document category which is based on the life cycle of the infrastructure and then by detail code which groups particular infrastructure elements together.

The State in which the document is applicable is shown in the Applicability table. Note, documents marked with NSW applicability also apply to QLD by default.

Designback to top

Number Title Last Updated Version
Document Type
Applicability
       
(under current document structure)
SA (S) WA (W) VIC (V) NSW (N) QLD (Q)
Level Crossings
ESN-06-01 Grade Crossing Predictor Design 29 Jan 07 1.0 Manual S W V N Q
ESI-03-11 XP4 Identification Management 17 Jan 19 1.0 Instruction S W V N Q

Constructionback to top

Number Title Last Updated Version
Document Type
Applicability
       
(under current document structure)
SA (S) WA (W) VIC (V) NSW (N) QLD (Q)
Level Crossings
ESI-03-03 S-60 Highway Grade Crossing Gate 12 Apr 13 1.0 Work Instruction S W V N Q

Maintenanceback to top

Number Title Last Updated Version
Document Type
Applicability
       
(under current document structure)
SA (S) WA (W) VIC (V) NSW (N) QLD (Q)
General
ESW-26-01 Signals Service Schedules / Standard Jobs 13 Jan 21 1.2 Work Instruction S W V N Q
Remote Control, Control Systems
ESW-02-01 Recommended Settings for Ruggedcom RS400 and RS900 Series Switch 23 Jan 18 2.0 Work Instruction S W V N Q
ESW-10-01 Configuration Requirements for Tranzeo TR-902 28 Jul 19 1.0 Work Instruction S W V N Q
Field Equipment: Track Circuits, Trackside Equipment
ESI-07-03 Track Circuit History Cards 06 Aug 10 1.0 Work Instruction       N Q
Power Supplies
ESI-09-01 Store 74 Battery Charger Resonating Capacitors 23 Sep 15 1.0 Work Instruction S W V N Q
Communications for Signalling
ESW-10-02 Westermo Configuration Guide 29 Sep 20 1.0 Work Instruction S W V N Q
Cable and Line Route
ESI-11-01 Rubber Insulated Signal Cable Inspection and Quarantine 04 Sep 15 1.0 Work Instruction S W V N Q
Controlled documents are as published on this site and are uncontrolled when printed