Track & Civil: Work Instructions
For assistance, email standards@artc.com.au or visit the Engineering Help pages. To report an issue in an engineering document or propose a change, please complete EGP0101F-02 Engineering Document Change Request and email this to standards@artc.com.au.
This page contains documents that are currently called Manuals and Engineering Instructions.
The State in which the document is applicable is shown in the Applicability table.
Note, documents marked with NSW applicability also apply to QLD by default.
- General
- Rail
- Sleepers and Fastenings
- Points and Crossings
- Track Lateral Stability
- Clearances
- Flooding
- Electrical Infrastructure
- Level Crossings
- Right of Way
General back to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
Operate | |||||||||
RC 4703 | Track Machines - Safe Procedures for Starting and Moving | 31 Mar 06 | A.0 | Manual | N | Q |
Rail back to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
Examination | |||||||||
RAP 5138 | Inspection of Insulated Joints - Procedure | 31 Mar 06 | A.0 | Manual | N | Q | |||
RAP 5139 | Inspection of Rail Wear - Procedure | 31 Mar 06 | A.0 | Manual | N | Q | |||
RAP 5140 | Inspection and Maintenance of Rail Lubricators - Procedure | 31 Mar 06 | A.0 | Manual | N | Q | |||
Maintenance | |||||||||
ETN-01-06 | Weld Quality Management Manual | 19 Oct 21 | 1.2 | Manual | S | W | V | N | Q |
RAP 5393 | Field Welding - Alignment Defects | 16 Jan 09 | 1.1 | Manual | N | Q | |||
RTS 3643 | Field Loading and Unloading of Welded Rails | 31 Mar 06 | A.0 | Manual | N | Q | |||
RTS 3646 | Continuous Welded Rail - Control of Creep | 31 Mar 06 | A.0 | Manual | N | Q | |||
RTS 3733 | Rail Repair using Wire Feed Welding | 16 Jan 09 | B.0 | Manual | N | Q | |||
RTS 3734 | Wire Feed Welding Manual | 31 Mar 06 | A.0 | Manual | N | Q | |||
RAP 5391 |
Aluminothermic Welds - Identification, recording and reporting Note - ETW0106F-01 Weld Return Form is to be progressively implemented until 30 June 2019. While RAP 5391 is being used during the implementation period, only information required in ETW0106F-01 is mandatory. |
09 Apr 13 | 1.2 | Manual | N | Q |
Sleepers and Fastenings back to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
General | |||||||||
ETI-02-04 | Use of Reclaimed Sleeper Plates | 08 May 07 | 1.0 | Instruction | N | Q | |||
Material | |||||||||
ETI-02-05 | Procurement of Spring Fastening Spikes, Additional Requirements to AS 1085.13-2002 | 08 May 07 | 1.0 | Instruction | N | Q | |||
Examination | |||||||||
RAP 5108 | Sleeper Inspection for Renewal Programs | 31 Mar 06 | A.0 | Manual | N | Q |
Points and Crossings back to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
General | |||||||||
ETI-03-05 | Manganese Steel Fixed Nose Crossings | 07 Aug 07 | 1.0 | Instruction | S | W | V | N | Q |
Construction | |||||||||
ETN-03-01 | 50kg Dual Gauge Turnouts and Gauge Separations - Construction and Maintenance Manual | 19 Jun 08 | 1.0 | Manual | S | W | V | N | Q |
ETW-03-01 | Using Temporary Take Offs | 14 Jun 13 | 1.1 | Work Instruction | S | W | V | N | Q |
Maintenance | |||||||||
RC 2304 | Field Replacement of RBM Crossing Inserts | 31 Mar 06 | A.0 | Manual | N | Q | |||
ETW-03-02 | Switch Blade and Stock Rail Profiling | 04 Mar 19 | 1.1 | Work Instruction | S | W | V | N | Q |
Track Lateral Stability back to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
Examination | |||||||||
ETI-06-08 | Track SFT Measurement by VERSE | 09 Jul 18 | 1.2 | Work Instruction | S | W | V | N | Q |
Clearances back to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
Examination | |||||||||
RAP 5135 | Inspection of Track Clearances - Procedure | 31 Mar 06 | A.0 | Manual | N | Q |
Flooding back to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
General | |||||||||
RAP 5221 | Preparation for Flood Emergencies | 31 Mar 06 | A.0 | Manual | N | Q |
Electrical Infrastructure back to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
Operate | |||||||||
ETI-14-01 | Trip Gear - Track Magnets (XPT and Explorer Trains) | 08 May 07 | 1.0 | Instruction | N | Q |
Level Crossings back to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
Examination | |||||||||
ETW-12-02 | Level Crossing Flangeway and Field Side Relief Asphalt Repair (formerly ETW-16-01) | 05 Feb 23 | 1.0 | Work Instruction | S | W | V | N | Q |
Right of Way back to top
Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
General | |||||||||
RAP 6831 | Cutting Firebreaks and Burning Off on Railway Land | 31 Mar 06 | A.0 | Manual | N | Q |
Controlled documents are as published on this site and are uncontrolled when printed