All Disciplines: Procedures
For assistance, email standards@artc.com.au or visit the Engineering Help pages. To report an issue in an engineering document or propose a change, please complete EGP0101F-02 Engineering Document Change Request and email this to standards@artc.com.au.
This page contains general engineering procedures that apply to all disciplines.
Engineering Instructions take precedence over Standards, Procedures and Specifications for that particular subject.
The State in which the document is applicable is shown in the Applicability table.
Note, documents marked with NSW applicability also apply to QLD by default.
- General Management and Admin
- Standards Management
- Configuration Management
- Doc and Drawing Management
- Engineering Authority
- Asset Management
- Project Management
- Procurement Management
- Third Party Engineering Interface
- Engineering Train Interfaces
- Risk Management
General Management and Administration back to top
| Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
| General | |||||||||
| EGP-01-03 | Engineering, Design and Project Management Identifiction of Competence Procedures | 02 Mar 26 | 2.1 | Procedure | S | W | V | N | Q |
| EGP-01-04 | Engineering Change Management | 10 Mar 26 | 1.0 | Procedure | S | W | V | N | Q |
Standards Management back to top
| Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
| General | |||||||||
| EGP-02-01 | Engineering Waiver Management | 2 Mar 26 | 2.8 | Procedure | S | W | V | N | Q |
Configuration Management back to top
| Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
| General | |||||||||
| EGP-03-01 | Rail Network Configuration Management | 12 Apr 23 | 2.3 | Procedure | S | W | V | N | Q |
| EGP-03-02 | Equipment & MST Register - Updating and Maintenance | 08 Sep 23 | 2.0 | Procedure | S | W | V | N | Q |
| OPG-30-02 | Network Information Books | 02 Jun 21 | 2.0 | Procedure | S | W | V | N | Q |
Document and Drawing Management back to top
| Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
| General | |||||||||
| EGP-04-01 | ARTC Engineering Drawings and Documentation | 03 Dec 25 | 4.4 | Procedure | S | W | V | N | Q |
| EGP-04-02 | ARTC Drawing Management System | 11 Apr 24 | 4.1 | Procedure | S | W | V | N | Q |
Engineering Authority back to top
| Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
| General | |||||||||
| EGN-05-01 | Technical Note - Use of Shall, Should and May in Engineering Documents | 15 Apr 24 | 1.0 | Technical Note | S | W | V | N | Q |
Asset Management back to top
| Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
| General | |||||||||
| EGP-10-01 | Enterprise Asset Management System Superseded by AMT-PR-010 This document has been relocated to the Asset Management Tab on the Extranet |
||||||||
Project Management back to top
| Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
| General | |||||||||
| EGP-20-01 | Project Management | 05 Sep 23 | 1.9 | Procedure | S | W | V | N | Q |
| EGP-20-02 | Inspection and Test Plans | 13 Dec 16 | 1.1 | Procedure | S | W | V | N | Q |
Procurement Management back to top
| Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
| General | |||||||||
| EGP-21-01 | New Equipment & System Approvals (Type Approvals) | 03 Oct 24 | 1.8 | Procedure | S | W | V | N | Q |
Third Party Engineering Interface back to top
| Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
| General | |||||||||
| PP-153 | Third Party Access to ARTC Property | 25 Feb 04 | 1.2 | Process Procedure | S | W | V | N | Q |
| PP-154 | Implementation of Private Sidings | 06 Apr 09 | 1.5 | Process Procedure | S | W | V | N | Q |
Engineering Train Interfaces back to top
| Number | Title | Last Updated | Version | Document Type |
Applicability | ||||
|---|---|---|---|---|---|---|---|---|---|
(under current document structure) |
SA (S) | WA (W) | VIC (V) | NSW (N) | QLD (Q) | ||||
| General | |||||||||
| EGP-37-01 | Permanent Speeds | 17 Jun 24 | 1.0 | Procedure | S | W | V | N | Q |
Risk Management back to top
ARTC's Risk Management procedure and work instructions are as follows:
| Number | Title |
|---|---|
| RSK-PR-001 | Risk Management Procedure |
| RSK-WI-001 | Application of Risk Management |
| RSK-WI-005 | Project Risk Management |
| RSK-WI-006 | Stop & Think |
Queries regarding the Risk Management procedure, work instructions and the template may be directed to the ARTC Risk Manager
