Electrical: Procedures

For assistance, email standards@artc.com.au or visit the Engineering Help pages.

This page contains documents that are currently known as NSW Standards.

The State in which the document is applicable is shown in the Applicability table.

Note, documents marked with NSW applicability also apply to QLD by default.

General back to top

Number Title Last Updated Version
Document Type
Applicability
       
(under current document structure)
SA (S) WA (W) VIC (V) NSW (N) QLD (Q)
General
EEG-00-01 Requirements for Electric Aerials Crossing ARTC Infrastructure 23 Dec 21 1.0 Standard S W V N Q
PGP 01 Authorisation and Training of Staff
available on request via ARTC project manager
               
PGP 02 Hazard Assessment and Work Process Controls
available on request via ARTC project manager
               
PGS 01 ARTC Electrical System General Description
available on request via ARTC project manager
               
PGS 02 Definitions
available on request via ARTC project manager
               
PSP 01 Electrical Power System - Safety Aspects
available on request via ARTC project manager
               
PSP 02 Public Electrical Safety Awareness Plan
available on request via ARTC project manager
               
PYP 01 Operating Agreement
available on request via ARTC project manager
               
PYP 02 Customer Installation Safety Plan
available on request via ARTC project manager
               
Transmission Lines
PYS 01 Transmission Line Easement Conditions
available on request via ARTC project manager
               

Design back to top

Number Title Last Updated Version
Document Type
Applicability
       
(under current document structure)
SA (S) WA (W) VIC (V) NSW (N) QLD (Q)
General
PDS 01 Substation Auxiliary Transformer from Rectifier Transformer Secondary
available on request via ARTC project manager
               
PDS 02 High Voltage and 1500 System Earthing References and Definitions
available on request via ARTC project manager
               
PDS 03 Low Voltage Distribution and Installations Earthing References and Definitions
available on request via ARTC project manager
               
PDS 04 System Substation Earthing
available on request via ARTC project manager
               
PDS 05 Distribution Substation Earthing
available on request via ARTC project manager
               
PDS 07 Low Voltage Distribution Earthing
available on request via ARTC project manager
               
PDS 08 Low Voltage Installations Earthing
available on request via ARTC project manager
               
PDS 09 Protection System Requirements for High Voltage Network - ARTC
available on request via ARTC project manager
               
PDS 10 Safe Limits of DC Voltages
available on request via ARTC project manager
               
PDS 11 Electrical Power Equipment - Design Ranges of Ambient Conditions
available on request via ARTC project manager
               
PDS 12 Common Requirements for Electrical Power Equipment
available on request via ARTC project manager
               
PDS 13 Above Ground Cable Installation Systems - Selection Guide - ARTC
available on request via ARTC project manager
               
PDS 14 High Voltage Cable Selection Guide - ARTC
available on request via ARTC project manager
               
PDS 15 Demarcation of ARTC Low Voltage Distribution System
available on request via ARTC project manager
               
PDS 16 Transformer Loss Evaluation
available on request via ARTC project manager
               
PDS 17 Insulation Co-ordination & Surge Arrester Selection
available on request via ARTC project manager
               
PDS 18 System Substation Battery
available on request via ARTC project manager
               
Transmission Lines
PDS 06 Transmission Line and Cable Earthing
available on request via ARTC project manager
               
PDS 19 Transmission Line Current Ratings & Standard Conductors
available on request via ARTC project manager
               
PDS 20 Transmission Line Standard for Design and Construction
available on request via ARTC project manager
               

Material back to top

Number Title Last Updated Version
Document Type
Applicability
       
(under current document structure)
SA (S) WA (W) VIC (V) NSW (N) QLD (Q)
General
PPS 01 Pole Mounted Distribution Transformer
available on request via ARTC project manager
               
PPS 02 Outdoor Ground Type Distribution Transformer
available on request via ARTC project manager
               
PPS 03 33kV AC Indoor Switchgear - Non-Withdrawable
available on request via ARTC project manager
               
PPS 04 11kV AC Indoor Switchgear - Non-Withdrawable
available on request via ARTC project manager
               
PPS 05 Low Voltage Isolating Transformers
available on request via ARTC project manager
               

Construction back to top

Number Title Last Updated Version
Document Type
Applicability
       
(under current document structure)
SA (S) WA (W) VIC (V) NSW (N) QLD (Q)
General
PCP 01 Commissioning of Translay Pilot Wire Protection Scheme
available on request via ARTC project manager
               
PCP 02 Testing of High Voltage Cables
available on request via ARTC project manager
               
PCP 03 Cable Route Selection Guide
available on request via ARTC project manager
               
PCP 04 Ground Entry Arrangements
available on request via ARTC project manager
               
PCP 05 Underground Cable - Location Recording
available on request via ARTC project manager
               
PCP 06 Advertising of new work
available on request via ARTC project manager
               
PCP 07 System substation Commissioning Tests
available on request via ARTC project manager
               
PCS 01 Requirements for Cable Polymeric Terminations and Joints
available on request via ARTC project manager
               
PCS 02 Underground Installation Configurations for High Voltage and 1500 Vdc Cables
available on request via ARTC project manager
               
PCS 03 Cable Pits
available on request via ARTC project manager
               
PCS 04 Electrical Phase Relationships
available on request via ARTC project manager
               
PCS 05 Standard Voltage Tolerances
available on request via ARTC project manager
               
PCS 06 Polarity of AC Signalling Supplies
available on request via ARTC project manager
               
PCS 07 Substations Minimum Construction Standards
available on request via ARTC project manager
               

Maintenance back to top

Number Title Last Updated Version
Document Type
Applicability
       
(under current document structure)
SA (S) WA (W) VIC (V) NSW (N) QLD (Q)
General
PMP 01 Electrical Technical Maintenance Coding System
available on request via ARTC project manager
               
PMP 02 Requirements for Handling & Disposal of Material containing PCB
available on request via ARTC project manager
               
PMP 03 Installation Inspections
available on request via ARTC project manager
               
PMP 04 Requirements for Work Using Cranes and Plant
available on request via ARTC project manager
               
PMP 05 Tools and Safety Equipment
available on request via ARTC project manager
               
PMP 06 Permit System
available on request via ARTC project manager
               
PMP 07 Requirements for Work Using Scaffolding and Metal Ladders
available on request via ARTC project manager
               
PMP 09 Work Near High Voltage Equipment - Permit Requirements and Safe Working Distances
available on request via ARTC project manager
               
PMP 10 Work on Live High Voltage Equipment
available on request via ARTC project manager
               
PMP 11 Isolation of High Voltage Equipment for work Outside Substations
available on request via ARTC project manager
               
PMP 12 Isolation of High Voltage Equipment for work Inside Substations
available on request via ARTC project manager
               
PMP 13 Work Near 1500V Equipment - Permit Requirements and Safe Working Distances
available on request via ARTC project manager
               
PMP 14 Work on or Near Low Voltage Distribution Equipment - Permit Requirements and Safe Working Distances
available on request via ARTC project manager
               
PMP 15 Isolation of Low Voltage Distribution Equipment for Work
available on request via ARTC project manager
               
PMP 16 Wood Pole Condemning Policy
available on request via ARTC project manager
               
PMS 01 Requirements for Portable Earthing Equipment for the High Voltage System
available on request via ARTC project manager
               
Transmission Lines
PMP 17 Transmission Line Maintenance Standards
available on request via ARTC project manager
               

Operate back to top

Number Title Last Updated Version
Document Type
Applicability
       
(under current document structure)
SA (S) WA (W) VIC (V) NSW (N) QLD (Q)
General
POP 01 Electrical Power Equipment - Integrated Support Requirements
available on request via ARTC project manager
               
POP 02 Suitable Operating Equipment
available on request via ARTC project manager
               
POP 03 Overview of the Electric Power System Safe Operation Manual
available on request via ARTC project manager
               
POP 04 Electrical Network Management Plan
available on request via ARTC project manager
               
POP 05 Operating Work - High Voltage System
available on request via ARTC project manager
               
POP 06 Operating Work - Low Voltage Distribution System
available on request via ARTC project manager
               
POP 07 Substations - Base Safety & Operating Standards
available on request via ARTC project manager
               
Transmission Lines
POS 01 Transmission Line Base Safety and Operating Standards
available on request via ARTC project manager