You can filter these records: Select the the Column you wish to filter in the "Filter by" drop down list. Then select the criteria for the filter.
You can sort records: Click on a column heading to sort records.
Return to the ARTC website

Check this box to open links on this page in the same browser window

Filter by:
12345678910...>>
Number TitleFile typeEffectivePostedStatus
perm_0028Amendments to LAU's South Vol 3 and 4PDF29/8/20045/9/2004permanent
perm_0024Amendments to LAU's West Vol 2 and 3PDF1/7/20045/9/2004permanent
perm_0022Alterations to LAU's North Vol 2PDF1/7/20045/9/2004permanent
perm_0021Temporary Speed Restrictions -Trial of Intermediate warning" signs"PDF1/7/20045/9/2004permanent
perm_0019Introduction of Level Crossing Speed SignsPDF1/7/20045/9/2004permanent
perm_0017Amendment LAU 280 South Vol 2PDF1/7/20045/9/2004permanent
temp_1042Binnaway - Coonabarabran - BaradinePDF13/7/20045/9/2004temporary
temp_1039Alterations to Lau 203 - North Vol 2PDF12/7/20045/9/2004temporary
      
      
2-1360TO BE READ IN CONJUNCTION WITH TAA 0541-2010: Mangoola - Sandy Hollow: Mangoola Balloon Loop - Installation of new Number 53 TurnoutPDF10/8/201027/7/2010 
2-1359Kiacatoo: Installation of New Main Line TurnoutPDF28/7/201021/7/2010 
2-1358Springridge to Premer: Missing / Stolen Ordinary Train StaffPDF19/7/201020/7/2010 
2-1357Amended: Albury: Restricted Routing Conditions due to Signal and Point Machine UpgradesPDF21/7/201020/7/2010 
2-1356Amended: TO BE READ IN CONJUNCTION WITH TAA 0497-2010: Commissioning Works at Albury: Pilot Staff Working Table Top to AlburyPDF23/7/201022/7/2010 
2-1355Albury South: Alterations to Signalling SystemPDF23/7/201019/7/2010 
2-1354Stabling of Track Vehicles in Quipolly LoopPDF21/7/201016/7/2010 
2-1353Trida: Provision of Active Level Crossing Protection at Willandra Road 749.390 km and Relocation of Train Order Working Signs at TridaPDF12/7/20106/7/2010 
2-1352Quandialla: Installation of New Main Line TurnoutPDF12/7/20106/7/2010 
2-1351Lithgow to Dubbo, Orange to Parkes, Werris Creek to Moree, Werris Creek to Tamworth, Joppa Junction to Canberra: CountryLink Services Resumption of Normal Track SpeedPDF6/7/20102/7/2010 
2-1350Moss Vale: Argyle Street Bridge Repairs Terminating Down Direction Cityrail ServicesPDF18/7/201029/6/2010 
2-1349 attachmentMoree South Drivers DiagramPDF30/6/201028/6/2010 
2-1349Moree to Gurley Section: Bulluss Drive: Upgrade of Level Crossing Protection and Alterations to Signalling InfrastructurePDF30/6/201028/6/2010 
2-1348Amended: Darnick: Provision of Active Level Crossing Protection at Pooncarrie Road 880.728 kmPDF2/7/201030/6/2010 
2-1347Narrabri West: Yard Alterations - Installation of Manual DerailersPDF29/6/201022/6/2010 
12345678910...>>

Number of documents:0